CHULLORA, NSW

Australia Post Parcel Sorting Facility

The Australia Post parcel sorting project at Chullora incorporated a major extension of the existing facility to accommodate the increased volume of parcel postage resulting from the online shopping boom. The project was completed under a fast track program of 28 weeks.

The $40 million extension includes the design and construction of an additional 15,000m² warehouse space which was connected to the existing operational facility.

The warehouse is a steel structure with low height pre-cast concrete walls, full height insulated wall panels with and an insulated panel roof. The warehouse floor is a mesh and fibre combination slab with a high-quality burnished finish. Building services include air-conditioning to the entire warehouse space with all major plant installed on platforms underneath the roof.  ADCO’s team also managed the integration of the specialist sortation equipment contract.

slide
slide

ADCO’S TEAM COORDINATED THE DESIGN AND CONSTRUCTION WORKS TO ACCOMMODATE THE INSTALLATION OF MAJOR MAIL SORTATION EQUIPMENT IMPORTED FROM THE NETHERLANDS.