Redland Hospital Expansion

Cleveland, QLD Redland Hospital Expansion

ADCO were engaged under an Early Contractor Involvement (ECI) contract working closely with Health Capital Division (HCD) and Metro South to deliver a new design for Stage 1 of the Redland Hospital Expansion.
This consisted of establishing a new project brief that better suited the available funding, and ADCO worked alongside HCD to collaboratively develop a design that incorporated the requirements of the project brief whilst continually providing budget and program advice. ADCO presented the design at defined design milestones which included the identification and leadership of value management initiatives to manage the gap between cost and budget.
Towards the end of the ECI phase, ADCO was engaged to deliver an Early Works package consisting of preparing the site for the building. These works consisted of disconnecting services and demolishing a redundant Medical Records building established on site.
The conclusion of the ECI involved the delivery of a D&C lump sum tender to deliver the Main Works. The Main Works consists of constructing a new building delivering a new 25 bed IPU ward (Inpatient Unit) which includes two isolation suites; a new 12 bed ICU ward (Intensive Care Unit) which includes an isolation suite and a simulation room and a link bridge connection from the existing Theatres to the ICU which requires close coordination with works being delivered by another project (providing part of this new link bridge)

HCD are very impressed with the ADCO team and the collaborative process delivered through the ECI and looks forward to working with ADCO in the delivery of these works for early 2025.
The building also incorporates shell spaces for consulting rooms, medical imaging and additional wards and theatres.

  • Type

    ECI to Design & Construct

  • Value

    $57 million

  • Duration

    19 months